Strict Standards: Only variables should be passed by reference in /home/consabol/public_html/wp-includes/pomo/mo.php on line 210

Strict Standards: Redefining already defined constructor for class OT_Admin in /home/consabol/public_html/wp-content/themes/nebraska/lambda/classes/class.admin.php on line 41

Deprecated: Assigning the return value of new by reference is deprecated in /home/consabol/public_html/wp-content/themes/nebraska/lambda/themeupdater/envato.php on line 206

Strict Standards: Non-static method lambda_table_shortcode::init() should not be called statically in /home/consabol/public_html/wp-content/themes/nebraska/functions/theme-shortcodes.php on line 518

Strict Standards: Non-static method lambda_slider_shortcode::init() should not be called statically in /home/consabol/public_html/wp-content/themes/nebraska/functions/theme-slider-shortcodes.php on line 95

Strict Standards: Declaration of lambda_description_walker::start_el() should be compatible with Walker_Nav_Menu::start_el(&$output, $item, $depth = 0, $args = Array, $id = 0) in /home/consabol/public_html/wp-content/themes/nebraska/functions/theme-menuwalker.php on line 39

Strict Standards: Only variables should be passed by reference in /home/consabol/public_html/wp-includes/pomo/mo.php on line 210

Strict Standards: Only variables should be passed by reference in /home/consabol/public_html/wp-includes/pomo/mo.php on line 210

Strict Standards: Only variables should be passed by reference in /home/consabol/public_html/wp-includes/pomo/mo.php on line 210
SUPERVISIÓN PROYECTO ELECTRIFICACIÓN DE TARIJA | CONSA S.R.L.
Deprecated: Function ereg_replace() is deprecated in /home/consabol/public_html/wp-content/themes/nebraska/functions/theme-custom-css.php on line 197

Deprecated: Function ereg_replace() is deprecated in /home/consabol/public_html/wp-content/themes/nebraska/functions/theme-custom-css.php on line 197

Deprecated: Function ereg_replace() is deprecated in /home/consabol/public_html/wp-content/themes/nebraska/functions/theme-custom-css.php on line 197

Deprecated: Function ereg_replace() is deprecated in /home/consabol/public_html/wp-content/themes/nebraska/functions/theme-custom-css.php on line 197

Deprecated: Function ereg_replace() is deprecated in /home/consabol/public_html/wp-content/themes/nebraska/functions/theme-custom-css.php on line 197

Deprecated: Function ereg_replace() is deprecated in /home/consabol/public_html/wp-content/themes/nebraska/functions/theme-custom-css.php on line 197

Deprecated: Function ereg_replace() is deprecated in /home/consabol/public_html/wp-content/themes/nebraska/functions/theme-custom-css.php on line 197

Deprecated: Function ereg_replace() is deprecated in /home/consabol/public_html/wp-content/themes/nebraska/functions/theme-custom-css.php on line 197
Go to Top

SUPERVISIÓN PROYECTO ELECTRIFICACIÓN DE TARIJA


Strict Standards: call_user_func() expects parameter 1 to be a valid callback, non-static method lambda_slider_shortcode::handle_slider_shortcode() should not be called statically in /home/consabol/public_html/wp-includes/shortcodes.php on line 236

DISEÑO Y SUPERVISIÓN DE CONSTRUCCIÓN DEL PROYECTO DE ELECTRIFICACIÓN DEL DEPARTAMENTO DE TARIJA

CLIENTE: Empresa Nacional de Electricidad (ENDE) juntamente con el Servicio Eléctrico de Tarija S.A. (SETAR).
MONTO: 3.932.400,00 Bs.
LOCALIZACIÓN: Departamento de Tarija.
FECHA DE INICIO: Noviembre de 1975.
FECHA DE CONCLUSIÓN: Abril de 1981.

ELECTRIFICACIÓN TARIJA

DESCRIPCIÓN DEL PROYECTO

Proyecto ubicado en el oeste de la ciudad de Tarija con un 70% del total de obra y la del sector este con un 30% del desarrollo total, desde Canasmoro al noroeste hasta Chocloca al sudeste.
El trabajo comprende el diseño y la supervisión de la construcción de:
-        293 km de líneas aéreas de 14.4/24.9 Kv. monofásicas y trifásicas.
-        185 km de líneas aéreas secundarias de 220/380 voltios.
-        6.654 conexiones domiciliarias.
-        1.100 equipos de alumbrado público.
-        Construcción de dos subestaciones nuevas de 6.6 – 24.9 Kv.
-        201 porta fusibles.
-        Potencia total disponible: 6.935 Kva.

El costo del proyecto alcanza a $b. 88.000.000 (Ochenta y ocho millones de Pesos Bolivianos)